分類 | 種類 |
八號幹線- 昂船洲大橋
Main Contractor:
Maeda - Hitachi - Yokogawa - Hsin ChongJoint Venture
Consultant/Client:
Ove Arup & Partners/Highways Department
Sub-Contractor:
(1) Gammon Construction Limited- Parapet/Sign Gantry
(2) China Merchants Heavy Industry Co. Ltd. -Access Gantry/Platform
(3) CLP Engineering Ltd./Chat HornEngineering Ltd./
Lucky Engineering Co. Ltd. -Electrical/ Sensor
Products:
JAM Grade 8.8 Hot Dip Galvanized Hex Boltwith Nuts and Washers M30 and M20
Application: Fastening Baseplate to Cast-in. Sockets Along Bridge deck for Parpet
Installation Products:
JAM Grade A4-80 Stainless Steel M30 Hex Bolt with Nuts, Square Taper Washer,
Square nylon Washers, Hot Dip Galvanized Steel Square Washer
Application: Erection of Sign Gantry
Products:
JAM Grade 8.8 Hot Dip Galvanized Threaded Rod M16x3M, M24x3M with Hex Nuts,
Flat Washers (Form C), Spring Washers, M27 x3M.
JAM Grade 8.8 Hot Dip Galvanized Hex Bolt with Nuts and Washers M12x40, M12x45,
M12x50, M12x80, M16x55, M16x65, M16x80, M24x80
Application: Installation of Access Platforms,
Support Brackets for Towers,
Erection Access Gantry at CT8,
Fixing of Lateral Bearing Steel Deck at CT8
Products:
JAM Grade 8.8 Hot Dip Galvanized Hex Bolt with Nuts and Washers M36, M30, M24, M20
Application: Erection Access Gantry at CT8,
Fixing of Lateral Bearing Steel Deck at CT8,
External PT System at CT8,
Erection of Access Gantry at CT 9
Products:
Stainless Steel A4-70 and A4-80 Hex Bolt with
Nuts and Washers M8x20, M8x30, M8x60,
M10x30, M12x40, M16x55; A4 Stainless Steel
Countersunk Head Screws M6x30, Pan Head
Screw M8x25
Application: East and West Towers Lighting &
DCL in Girder, Support Brackets Fixing on
Towers, Upper Tower Cable Containment
Fixing & Various Electrical Installation; Sensor
Installation for Monitoring System for Bridge
Products:
JAM Hot Dip Galvanized Beam Clamp M12
Application: Fastening Stainless Steel Slotted
Channel Frame to Steel Angle Frame for
Electrical Installation,
Products:
JAM Beam Clamp M6
Application:
Fastening Cable Conduits and Box
to Steel Column Frame along Internal Surface of Towers
Date: 2008 07