香港地鐵 (新支綫及工程項目)

南港島綫(東段)- 904 利東站、海怡半島站及鐵路隧道工程

MTR South Island Line (E)- 904

Lei Tung Station, South Horizons Station and Tunnels

 

 

Main Contractor:

Leighton - John Holland Joint Venture

 

Products:

JAM Grade 8.8 Threaded Rod (Hot Dip Galvanized)

M16 x 3000mm c/w Grade 8 Nut
M30 x 600mm c/w Grade 8 Nut

M20 x 350mm c/w Grade 10 Nut

 

JAM Grade 8.8 Hex. Head Bolts (Hot Dip Galvanized) c/w Grade 8 Nut and Washer
M33 x 160mm, M27 x 140mm, M24 x 100mm, M20 x 90mm

 

JAM Grade 8.8 Hex. Head Bolts (Zinc Plated) c/w Grade 8 Nut and Washer
M24 x 100mm, M24 x 50mm, M20 x 90mm, M20 x 75mm, M20 x 65mm, M16 x 70mm, M16 x 50mm, M16 x 45mm, M12 x 30mm

 

JAM-W (Zinc Plated) Anchor M12 x 120mm, M12 x 90mm

 

MKT-B (Hot Dip Galvanized) Wedge Anchor M20 x 145mm

 

 

Date: 2011 09 - 2012 07