分類 種類
香港地鐵 (新支綫及工程項目)

南港島綫(東段)- 903 海洋公園站、黃竹坑站、高架橋及香港仔海峽橋工程

MTR South Island Line (E) -

903 Ocean Park Station, Wong Chuk Hang Station,

Viaduct and Aberdeen Channel Bridge

Main Contractor:

Leighton Contractor (Asia) Limited

 

Products:

JAM G 8.8 HOT DIP GALVANIZED Fully Threaded Rod c/w

Grade 10 Nut and Flat Washer

M39 x 3000mm, M39 x 375mm

 

JAM G 8.8 ZINC PLATED Fully Threaded Rod c/w

Grade 8 Nut and Flat Washer

M20 x 3000mm

 

JAM GRADE 8.8 ZINC PLATED HEX BOLT c/w

Grade 8 Hex. Nut, Flat Washers & Nylon Washer

M24 x 120mm, M24 x 90mm, M20 x 100mm, M20 x 50mm,

M16 x 150mm, M16 x 60mm, M16 x 50mm, M16 x 35mm

 

ZINC PLATED Wedge Anchor

JAM-W M12-25/120mm

JAM-W M16-25/160mm

 

Date: 2012 06